Your cart

Close

Your cart is currently empty.

Login

Close
Black Friday
Fuenta New DWB Bi-Fold Shower Door Chrome
Fuenta New DWB Bi-Fold Shower Door Chrome in Bathroom
Fuenta New DWB Bi-Fold Shower Door Chrome - Hinges with Up and Down Mechanism
Fuenta New DWB Bi-Fold Shower Door Chrome - Flush Fitting Hinges
Fuenta New DWB Bi-Fold Shower Door Chrome - Gaskets
Fuenta New DWB Bi-Fold Shower Door Chrome - Left and Right Version
Fuenta New DWB Bi-Fold Shower Door Chrome - Dimensions

Fuenta New DWB Bi-Fold Chrome Shower Door

SKU: 384075-01-01L

€798.00
save 0
VAT included. Shipping calculated at checkout.
Opening

Fuenta New DWB Bi-Fold Chrome Shower Door Description

opening bi fold

The Fuenta series is characterized by modern design and elegance, which on one hand delight with their universality, and on the other with their originality. The variety of models allows you to use one of them to arrange the bathroom in many styles. The advantage of this series is a special system that allows leveling the wall curvature up to 15 mm.

Catalogue Sheet 

Click here for more information regarding measurements and adjustments on this shower enclosure

  

6mm Glass

GLASS 6 MM - Safety glass (tempered) with a thickness of 6 mm. The glass is compatible with standard PN:EN 12150:1


Fixing system     FIXING SYSTEM - Wall mounting system with profiles allowing levelling             of the curvature of the wall.



FLUSH FITTING - The brackets and hinges are flush-fitted with the glass pane. A flat surface facilitates the process of keeping the shower enclosure clean.



UP AND DOWN MECHANISM - Prevents damage to the gasket and guarantees quiet and trouble-free operation.


MAGNETIC STRIP - ensures tightness of the cabin.

ELASTOMER SEALS - resistant to temperature and humidity changes.


Montage without shower Tray

MONTAGE WITHOUT A SHOWER TRAY - This shower enclosure might be mounted on the shower tray as well as directly on the floor.

 

Montage without Threshold

POSSIBLE MONTAGE WITHOUT A THRESHOLD - As a standard, all the components needed for shower enclosure assembling are added to the product whenever it is the enclosure with or without a threshold. All necessary instructions can be found in the assembly manual.